Mandates achieved

  • The main entrances
  • The entrance to the Pavillon D’Youville
  • And emergency

Issues

Main entrances

Ineffective scraper grill

Becomes very slippery when wet = danger of falling, does not cover the entire vestibule.

Broken ceramic

Expensive and recurring repair of ceramic which breaks between the door sill and the grill.

Solution

Axess Group

An impeccable result

  • Removal of the grid in place and all the ceramic from the main entrances.
  • The basins of the old grids are filled with concrete and the entire surface of the vestibule is covered with our Hall@x grid.

Benefits

Ste-Croix Hospital

  • Permanent and safe solution
  • Anti-slip
  • Easy maintenance
  • Durable material
  • Made by a Quebec company